I’m currently reviewing bids for a 5MW project and noticed some contractors skipping detailed geotechnical surveys. In my experience, the ground mounted solar structure is only as good as its foundation. If you’re planning a project, don't cut corners here—ensure your solar EPC contractors conduct proper pull-out tests to match the soil bearing capacity. A failure in the mounting structure during high winds isn't just a maintenance headache; it’s a total asset risk.